Tuesday, August 30, 2016

Palma de Mallorca - Boat work, birthdays and Finike friends

August 29 - September 23

I am exhausted just thinking about this post LOL.

We arrived into Palma de Mallorca for our much anticipated haul out and re-rigging. The haul out was delayed by 1 day so we had to stay at a marina. We had confirmation from STP boatyard that we were scheduled for the haul out at 3:00 PM on the 30th.

We readied the boat and departed for STP. Upon arrival the staff were waiting for us with the lift. Shaun steered us in and we tied up while the fellows got the straps set for the lift. They raised us out of the water just enough for us to jump off the boat, then it was off to our spot. Luckily this time we had stairs instead of a ladder. This made life easier as we were up and down multiple times a day.

We noticed many huge yachts being worked on in the boat yard. It is amazing how much money was surrounding us.

our neighbour s/v Bristolian
Our goal during this haul out was below the water line projects like anti fouling, engine work and one above the water line project to replacement of our standing rigging.

Our first job to tackle was bottom repairs and bottom paint. We had to sand off the old paint and reapply. Shaun started with a 200 grit paper and soon realised it wasn't even denting it. He worked his way down to 120 without success so decided that perhaps it was time to seek a professionals opinion. Absolute Boat Finishing (http://www.absoluteboatcare.net/index.htm) was super helpful with this. Wayne and Simon popped by to let us know that our bottom was basically pretty messed up due to the fact the previous owners only added layers of paint instead of sanding off old paint and then re-applying. Our choice at this point was to hire Absolute to sand blast ($20,000 euro) or use a 40 grit paper down to the old primer, paint on a primer product called Primacon (it adheres to old primer and new primer), and then paint on the anti foul. We opted for our second choice.

During Absolutes visit to our boat with advice, Wayne took a look at our Starboard rudder (that we broke last year in Leros, Greece) and told us flat out that it was full of water. Shaun drilled 3 holes in the water just poured out. We had noticed weeping but did not expect that amount of water. We later found out that the fellow that made the new rudder had filled the injection sites with gel coat instead of repairing it properly with fibreglass...... What a pain in the ass!

Shaun taped the edge at the waterline, repair areas and through hulls so that we didn't scuff up our gel coat or damage any parts. As for the sanding part...... this is, was and will always be the crumbiest job. The dust is toxic so we had to wear respirators, double goggles, gloves, and Tyvek suits with hoods. It was sweaty, exhausting, and dirty work as the dust sneaks in everywhere.  Of course a day after we arrived I came down with a terrible cold and was on light duty for a couple of days. Due to this it took us 4 days to sand down both hulls.

Next came the Primacon primer which was a fantastic product to work with. It went on nice and thick,  smoothly and quickly. During this phase Shaun was prepping areas on the bottom (rudders and dagger boards) that needed fibreglass repairs.  We knew that there were going to be spots that would have to be sanded, primed and anti fouled before splashing back in the water, so the fibre glass repairs would be finished then. Luckily, the plan was to be put in the sling overnight to finish these details.

The last phase was to apply anti foul paint. Anti fouling is tricky work. Due to its toxic nature it is necessary to wear Tyvek suits and eye protection. If it gets on the skin it is best to be removed quickly. There was also wind to contend with that made the paint in the tray dry quickly and clump so we had to work fast. I was able to apply 2-3 layers on the rudders and daggerboards as well so that they would be well protected.

getting ready to sand the anti foul
before we started sanding
applying the Primacon
I got to use Absolutes lift to reach the higher bits. This was fun.
my work of art
my partner in crime
During our bottom painting days Pro-Rigging (http://www.pro-rigging.com/en/) arrived to remove our sails, mast, and boom in preparation for our rigging to be replaced. I wasn't there to witness the removal as I was off birthday shopping/Christmas shopping at the well stocked mall.

Initially Shaun had contacted Pro-Rigging in July as they were recommended to us by RSB Rigging as they were booked solid. During the time from July to September Shaun had sent Rodrigo all of the information/pictures of our rigging in hopes that we could arrange for everything to be done in a timely matter when we were on the hard. Sadly, this did not happen. There were a couple of no shows and a delay with parts. It seems that the Pro-Rigging in Palma have too much work and have trouble attending to all their clients needs in a timely fashion. All in all it was a frustrating process that turned out great in the end. There were several times when we questioned our choice but are very glad that we had our work done with this company. The workmanship is exceptional.

crane to remove the mast
Rodrigo and crew removing the roller furlers
crane removing our mast
During our time on the hard our Canadian friends from s/v Maple (whom we met in Finike) arrived back to Palma requiring a haul out and rig work as well. It was great to reunite and let the kids play. Janet was gracious enough to help cut down some hoses for the engine room. We also were able to have a last minute "birthday party" (cupcakes and gifts) with them. Jordan was thrilled. what do you do when there is no frosting aboard for cupcakes? Take the advice from a fellow cruiser and use Nutella.

early "birthday party" with our Canadian friends on s/v Maple: from left to right: Jordan, Iris, and Ella
actual birthday gift opening
story/card made by Paige
new dress
new paint by number in progress
enlisting help from our friend Janet from s/v Maple to cut down hoses for the engine room
Also, during our stay yet another cruising boat that we met in Finike arrived, Sandra and Jeff on s/v Nawii. It was such a treat to catch up with everyone and gave us a breather from the crappy boat work.

our mini Finike, Turkey reunion - from left to right: Darryl, Sandra, Jeff, Janet, and Shaun
We enticed Paige into polishing our propellers (this included scraping) for money. We called it shop class for school. She did a fantastic job and they were gleaming once she was finished.

Shaun replacing a seal
before shot of the dirty propeller
action shot of the scraping phase
final gleaming product
attached to boat ready to be used
On September 15 we splashed back into the water without our mast. Element sure looked different, and not in a good way. Our mast was scheduled to be replaced 2 days later so we headed into the bay next to the boatyard.

shiny new boat
just before we splashed back into the water
We arrived back into "the pit" boat slip in preparation to have the mast replaced. The crew arrived early the next morning and the task was completed without a hitch. It was so nice to see Element with all her parts and looking back to normal.

crane lifting the mast into place
Pro-Rigging crew reattaching everything
shot of how the crane was holding the mast in place
A day or two later we picked up Rodrigo from the fuel dock so that he could sail with us and fine tune any deficiencies. Good news, it was in perfect order. Sadly, Shaun's and my sailing skills were not in top form and whenever we tacked it never went smooth. Rodrigo must have thought we were amateurs. We dropped him off and headed back to anchor. 

We couldn't get our anchor to stick so we headed 5 miles to a place that Simon from Absolute suggested. It worked out perfectly. Next stop on our adventure, Formentera.


Follow our video adventures on our YouTube channel: Video adventures of s/v Element

Tuesday, July 26, 2016

Italy part 2 - Cortona & surrounding area

July 26 - 31

On Tuesday Shaun had organised a 5.5 hour speed train from Rome to Camucia which is 10 minutes from Cortona. As the train ride progressed we started to notice stunning countrysides with loads of farmlands (hay, corn, sun flower) interspersed with vineyards, olive groves, cyprus trees and stone buildings. I’m in love.

We arrived into Camucia, which is a quiet town. The train station is small with a lovely little café. When we walked outside we didn’t see the taxi stand so Shaun and Jordan headed out to see what they could find. 2.5 KM’s later they found a rental car and came back to pick Paige and I up. We drove the 10 minutes to Cortona which is located up on the hill (where the book and movie Under the Tuscan Sun were written and filmed). What a scenic location with exquisite views into the valley. We found a parking spot and walked up to be greeted by striking stone buildings, cobble stone/brick streets. It is a walled city and only locals are allowed to drive inside. Inside there are traffic limito signs and cameras throughout the city and unsuspecting people get dinged fines, so beware. 

As we walked into the village we walked through a quiet tree lined park with a fountain and a play park. As we continued along we meandered past cafés, shops and alleyways. We arrived into the centre where there are steps up to a museum. Our hotel (Hotel Italia) is located down a narrow street not far from the town centre and used to be a palace. We had to book two rooms as they did not have any rooms that could accommodate 4 people. It worked out well. The girls room had excellent wifi but a non functional TV. Our room had the old world charm and we really enjoyed the quiet.

Breakfast was included every morning and included a spectacular view of the surrounding valley. The valley reminded us of the valley in Chilliwack, BC. 


centre clock tower
our hotel
map of Cortona



view into the valley at breakfast


stairwell
on the stairs of the clock tower

narrow streets 

beautiful views

neat doors 
lovely park with a fountain





learning to play this instrument

centre of the village




our street
our hotel reception

We took a road trip to see a couple of the other villages. On our drive we definitely got to enjoy the tuscan countryside as we drove through the national park. I fell in love with the sun flower fields, hay fields, vineyards and olive groves. I could see myself growing old while tending to an olive grove or a sunflower field.

Our first stop was to find a cash machine that allowed us to pull money as the one in Cortona wouldn't allow us to pull money. It was lunch time so we decided to grab a meal at a local restaurant. Our next stop was a village I can not remember the name. It was stunning with narrow streets and a plethora of wine shops.

sun flowers my favourite



Paige's awesome meal
scenic fields


vineyard 


At our final stop we walked through a lovely tuscan village with stunning views. We stopped for gelato before continuing through the streets.



yes, I could live here


















tea anyone..... the dwarfs are friendly

the local hospital





a back garden
On our drive back to Cortona we stopped and too some pictures of the lovely vineyards along the way. We also spotted other villages situated high on top of the hills overlooking the fields.











We drove through some rain but were graced with a rainbow. Jordan was telling us exactly where the pot of gold would be.







If you have a chance to visit Tuscany, Cortona is a lovely village to visit.

Follow our video adventures on our YouTube channel: Video adventures of s/v Element